Layout wiring and rough-in
Branch circuits, boxes, pathways, and electrical rough-in placed around the approved walls, counters, ceilings, and equipment.
Tenant finish-outs and remodels
Rough-in, trim-out, lighting changes, equipment circuits, and punch work for tenant spaces and commercial remodels across the San Antonio area.
From an empty suite to opening day
Walls move. Equipment changes. Lighting layouts get revised. The tenant still has a date when the space needs to open.
Texas Made Electric handles the electrical work inside that moving schedule, from layout changes and rough-in through fixtures, devices, equipment power, and punch.
Finish-out scope
Branch circuits, boxes, pathways, and electrical rough-in placed around the approved walls, counters, ceilings, and equipment.
Fixture layouts, relocations, switching, controls, emergency or egress-related lighting scope, and final trim.
Power for tenant equipment based on the electrical requirements supplied for the project.
Panel schedules, breakers, circuit additions, and distribution changes that support the new tenant layout.
Receptacles, switches, plates, fixtures, and final electrical connections installed after finishes are ready.
Final changes, corrections, labeling, and job details that need to be complete before turnover.
The sequence matters
Compare the drawings with the suite, existing service, and what is already in place.
Place the electrical work with framing, mechanical, plumbing, ceilings, millwork, and equipment in mind.
Return after finishes for devices, fixtures, equipment circuits, and final connections.
Resolve final items and leave the electrical work organized for the tenant and project team.
A better first call
Use the latest electrical and architectural sheets so the scope starts from the right layout.
Provide manufacturer data or schedules for anything that needs dedicated electrical power.
Share rough-in, ceiling, trim, equipment, inspection, and opening dates that affect the electrical work.
Questions before you call
Scope can include rough-in, lighting, switching, receptacles, panels, dedicated equipment circuits, trim-out, final connections, and punch work. The plans and site conditions determine the final scope.
Many remodels and tenant projects happen inside active properties. Access, shutdowns, business hours, and tenant coordination should be discussed before scheduling.
Send the current architectural and electrical sheets, equipment schedule, landlord criteria, and any revisions that affect walls, ceilings, lighting, or power.
Call as soon as the plans and target schedule are available. Early scope review reduces conflicts once framing and other trades are moving.
Related work
Call with the project address, current plans, and target schedule. Start the electrical scope before rough-in dates are on top of you.